There are no violations of NPP safe operation
limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical
protection work in normal mode.
NPP security divisions and
physical protection services are on high alert.
Unit
Number
|
Unit status
|
Аverage dose rate on an industrial
site (µSv/h)
|
Zaporizhzhya NPP
|
1
|
In
outage till 23.12.2019
|
|
2
|
Power 1025 MW (el.)
|
|
3
|
Power 870
MW (el.)
|
0,11
|
4
|
Power 895 MW (el.)
|
|
5
|
Power
790 MW (el.)
|
|
6
|
Power 965 MW
(el.)
|
|
Rivno NPP
|
1
|
Power
435 MW
(el.)
|
|
2
|
Power
425 MW
(el.)
|
0,10
|
3
|
Power
1000 MW (el.)
|
|
4
|
Power
1010 MW (el.)
|
|
Khmelnitsky NPP
|
1
|
In outage till 20.12.2019
|
|
2
|
Power
1010 MW
(el.)
|
0,12
|
South
Ukrainian NPP
|
1
|
Power 1021 MW (el.)
|
|
2
|
Power 1022 MW
(el.)
|
0,12
|
3
|
Power 820 MW (el.)
|
|
Chornobyl NPP
|
Decommissioning
|
0,31
|
Performance indicator of NPP
Units:
Rivne NPP
Khmelnitsky NPP
South-Ukraine NPP