Search |
 |

|
 |
 |
 |
19 March, 2017 |
|
 |
|  |
|
19 March 2017
|
 |
 |
There are no violations of NPP safe operation limits and conditions.
Radioactive situation meets established norms.
Systems of NPP physical
protection work in normal mode.
NPP security divisions and
physical protection services are on high alert.
Unit
Number
|
Unit status
|
On-site
radiation level (µR/hour)
|
Zaporizhzhya NPP
|
1
|
Power 985 MW (el.)
|
11,0
|
2
|
Power 765 MW
(el.)
|
3
|
In outage till 12.11.17
|
4
|
Power 990 MW
(el.)
|
5
|
Power 940 MW
(el.)
|
6
|
Power
770 MW (el.)
|
Rivno NPP
|
1
|
Power
440 MW
(el.)
|
9,0
|
2
|
Power
405 MW
(el.)
|
3
|
In outage till 23.03.17
|
4
|
Power 1000 MW
(el.)
|
South
Ukrainian NPP
|
1
|
Power 950 MW (el.)
|
12,5
|
2
|
Power 605 MW (el.)
|
3
|
Power 800 MW (el.)
|
Khmelnitsky NPP
|
1
|
Power 1010 MW (el.)
|
12,0
|
2
|
Power 1010 MW
(el.)
|
Chornobyl NPP
|
Decommissioning
|
30,0
|
|
|
 |

|